Budds Farm WwTW

4D knew who to turn to when they wanted the complex metalwork on Budds Farm for Southern Water. We were involved in upgrading the plant which is  located in Hampshire on the south coast near Portsmouth which treats wastewater from both Portsmouth and Havant catchments with a total population equivalent of approximately 400,000 and an incoming flow of approximately 2,400l/s. There was work on the existing ASP Tank and also extensive Metalwork on the new ASP Structure. Access Design carried out all the design, fabrication and installation.

Back to Top