Crossness WWTW (TTQI)

£220m upgrade at Crossness Sewage Treatment Works. Crossness serves 2 million Londoners, with now a 44% increase in sewage treatment. Design, supply and installation of walkways, platforms and stairs to various structures on water treatment works. Scope includes over 500t support steelwork, 2500m2 open mesh flooring, 600 meters of handrails and 3 number 15 meter tall stairs to PTW area. End user: Thames Water  

Back to Top