Scarborough Water Treatment Works

Access Design and Engineering were awarded Scarborough Water Treatment Works by Morgan Sindall, who were the main contractor for Yorkshire Water. There were various sites included in this Project with varying scopes. One of the most challenging areas on this project was the design and installation of the UV Chamber, this incorporated both steel and GRP to provide removable covers to allow the client to inspect and maintain their Trojan machines.  

Back to Top